DIGITAL MAINTENANCE TROLLEY SY1200

SY1200

11870×2510
×6430mm

Dimension (L×W×H)

8m/min

Maintenance Speed

158mm

Ground Clearance

ADVANTAGE INTRODUCTION

Suitable for concrete curing after secondary lining in tunnels of double track railways, double track highways, and third track highways.
Suitable for concrete curing after secondary lining in tunnels of double track railways, double track highways, and third track highways.
Unmanned: unattended automatic maintenance, simple operation, reducing labour costs; Safety: independent maintenance running track, walking smoothly, reducing safety risks; Economy: the equipment can be applied to different sections, realizing repeated use in multiple sites and saving equipment investment costs; Energy saving: 1 time second lining concrete curing water is not more than 1m³, reduce water costs.
Parameters of the machine
Overall dimensions (L×W×H) 11870×2510×6430mm
Total weight  2150kg
Maintenance length 12m
Maintenance range (width) Double and triple lane road/railway (can be customized according to section)
Maintenance speed 8m/min (variable frequency adjustable)
Total working power 7kW
Drive steering form Two-wheel drive with steering
Minimum ground clearance 158mm
Wheelbase 3400mm
Tank volume 2×1m³
Driving mode Electric motor driven hydraulic power pack
Travel of maintenance trolley 6010mm
External power supply 380V±10%
External hose diameter Φ25mm
Temperature control system (optional)
Heating power 12×4kW
Temperature control range <60℃
Temperature control Temperature drop 2℃/h
Tank heat preservation efficiency According to the concrete surface temperature adjustment of water temperature <15℃
Information detection system (optional)
Recording, storage and transmission of maintenance data YES
Concrete surface temperature measurement records YES
Record of water temperature detection YES
Curing position setting YES

RECOMMENDED