DIGITAL MAINTENANCE TROLLEY SYT12

SYT12

12000mm*12000~
13000mm*9751~
10000mm

Dimension (L×W×H)

8m/min

Maintenance Speed

12×4kW

Heating Power

ADVANTAGE INTRODUCTION

Suitable for concrete curing after secondary lining in tunnels of double track railways, double track highways, single track railways, and triple track highways.
Suitable for concrete curing after secondary lining in tunnels of double track railways, double track highways, single track railways, and triple track highways.
Unmanned: unattended automatic maintenance, simple operation, reducing labour costs; Safety: independent maintenance running track, walking smoothly, reducing safety risks; Economy: can be reused on multiple construction sites, saving equipment investment costs; Energy saving: can be used as a work platform for secondary lining concrete surface maintenance, radar detection, secondary lining impact detection, etc.
Parameters of the machine
Maintenance range (length) 12000mm
Maintenance range (width) 12000~13000mm(Can be customized according to section)
Maintenance range (height) 9751~10000mm(Can be customized according to section)
Total weight 8800kg
Maintenance speed 8m/min(Variable frequency adjustable)
Travel of maintenance trolley 12000mm
Left and right wheelbase 8200mm
Front and rear wheelbase 3500mm
Water tank volume 2×1m³
Drive steering form Front wheel steering + rear wheel drive
External power supply 380V±10%
External hose diameter Φ25mm
Temperature control system (optional)
Heating power 12×4kW
Temperature control range <60℃
Temperature control Temperature drop 2℃/h
Tank heat preservation efficiency According to the concrete surface temperature adjustment of water temperature <15℃
Information detection system (optional)
Recording, storage and transmission of maintenance data YES
Concrete surface temperature measurement records YES
水温检测记录Record of water temperature detection YES
Curing position setting YES

 