Digital Pouring Lining Trolley ST12

ST12

ADVANTAGE INTRODUCTION

Suitable for intelligent lining and pouring of road and railway tunnels, pumped storage power stations, hydropower stations, reservoir irrigation holes and underground caves and reservoirs.
Suitable for intelligent lining and pouring of road and railway tunnels, pumped storage power stations, hydropower stations, reservoir irrigation holes and underground caves and reservoirs.
High structural strength, simplicity, large space at the top, sides and bottom, improving the working environment, increasing the ventilation cross-section area and facilitating the passage of engineering vehicles. Simple operation, effectively reduce the labour intensity of workers and reduce the number of operators; Adopting concrete layered placing machine effectively improves the pouring quality of the second lining concrete, saves the pouring time, improves the efficiency, and reduces the construction cost and safety risk; Equipped with information-based monitoring system, real-time detection of data such as pouring position and pouring square volume in the trolley bins to achieve a controllable and traceable process.

RECOMMENDED
PRODUCTS